Turning Operational Challenges Into ILI Success
In this case study, learn how a major pipeline operator overcame high flow rates that risked inspection accuracy and power plant output through innovative speed control technology.
You will discover how they:
- Overcame speed control limitations without reducing product flow
- Maintained inspection accuracy in harsh, debris-filled conditions
- Completed long-distance inspections efficiently and on schedule
- Turned a complex challenge into a repeatable success model for future ILI runs