Turning Operational Challenges Into ILI Success

In this case study, learn how a major pipeline operator overcame high flow rates that risked inspection accuracy and power plant output through innovative speed control technology.

You will discover how they:

  • Overcame speed control limitations without reducing product flow
  • Maintained inspection accuracy in harsh, debris-filled conditions
  • Completed long-distance inspections efficiently and on schedule
  • Turned a complex challenge into a repeatable success model for future ILI runs